[SMM Weekly Review] The market demand for second-life application remained stable this week (June 30, 2025 - July 3, 2025)

Published: Jul 10, 2025 18:30
From an overall data analysis perspective, the rigid demand in the ESS sector remained stable at the end of June, with both domestic and overseas demand receiving certain support from mid-year factors and various policies. Currently, the auto sales boom driven by auto shows in the early part of July is gradually fading, with the penetration rate of NEVs in the market remaining stable. However, the current consumption momentum in the end-use market is insufficient. It is expected that there will be some increase in end-use demand, but it will be relatively limited. In terms of market transactions, as of the end of June, market transactions remained sluggish, with some second-life battery producers largely refraining from building up inventory and maintaining a just-in-time procurement strategy. As July progresses, after the mid-year period, there is further room for a decline in demand in both the NEV and ESS markets.

SMM July 10 News:

Second-life batteries: Based on overall data analysis, the rigid demand in the ESS sector remained stable at month-end June, with both domestic and overseas demand receiving certain support from mid-year and various policies. The auto sales boom driven by auto shows in the early June gradually faded, with the penetration rate of NEVs in the market remaining stable. Currently, the consumption momentum in the end-use market is insufficient. It is expected that there will be some increase in end-use demand, but it will be relatively limited. In terms of market transactions, as of month-end June, market transactions remained sluggish. Some second-life battery producers basically did not build up much inventory and maintained a just-in-time procurement strategy. As July arrives, after the mid-year period, there is further room for demand in the NEV and ESS markets to decline.

 

 

 

SMM New Energy Research Team

Cong Wang 021-51666838

Rui Ma 021-51595780

Disheng Feng 021-51666714

Yanlin Lv 021-20707875

Zhicheng Zhou 021-51666711

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
13 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
13 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
13 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
13 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
13 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
13 hours ago